§ 22-132. Streets subject to program.  


Latest version.
  • New street construction, which at the time of commencement of construction is located on proposed right-of-way corridors classified by the master street plan of the city as an arterial street, a collector street or a local street, shall be the subject of the cost participation program established by this article if the board of directors shall, by resolution adopted at the time of authorization of construction, designate all or a portion of same as an element of the program.

(Code 1976, § 27-82; Ord. No. 68-99, § 1, 10-19-99)