§ 11-88. Erosion and sediment control plan.  


Latest version.
  • The applicant shall prepare and submit an erosion and sediment control plan that shall include:

    (1)

    Sequence of clearing and grading anticipated for construction of the development site. Sequencing shall include the anticipated dates for the start of construction, installation of temporary erosion and sediment control measures, and establishment of permanent vegetation.

    (2)

    Erosion and sediment control measures necessary to meet the objectives of this article that will remain installed and functioning throughout all phases of construction and after completion of development of the site until soil stabilization with permanent vegetation.

    (3)

    Proposed seeding mixtures, types of sod, method of seedbed preparation, expected seeding dates, kind and quantity of mulching for both temporary erosion control and permanent vegetative stabilization.

    (4)

    Provisions for maintenance of control facilities until the site soils are stabilized with permanent vegetation.

    (5)

    Submission of a copy of notice of intent or automatic coverage posting as required by ADEQ.

    (6)

    A description of post-construction stormwater management measures that will be installed during the construction process to control pollutants in stormwater discharges that will occur after construction operations have been completed. Post-construction stormwater management measures shall comply with the requirements of the City of Fort Smith Drainage Standards.

    In addition, the erosion and sediment control plan shall meet the requirements for a stormwater pollution prevention plan as established by the latest version of the ADEQ NPDES general stormwater permit for construction activities.

(Ord. No. 27-06, § 1, 3-21-06; Ord. No. 54-11, § 7, 7-5-11)